Wednesday, November 24, 2010

3 weeks in 1 (part 2)

i have also taken many photos as showen below next week will have steps on what we have done
straightening a stud with fish plates and wedge

roof gutter

finished building wrap for water and weather protection

how to cut building wrap for an opening

corner moldings used on the bottom corners of an opening

aluband used across the the whole bottom of an opening and up 200mm

aluband used at the top corners of an opening going out 200mm with butterfly 100mm x 50mm

ceiling battons on each side of opening from bottom of lintel to 100mm below floor

vernem strip along the house

vernem strip cut to allow for corners

packers and wedges used to help fit in windows

window temp fitted into opening

blocks set under window at 5 degrees and 50mm spacing