straightening a stud with fish plates and wedge |
![]() |
roof gutter |
![]() |
finished building wrap for water and weather protection |
![]() |
how to cut building wrap for an opening |
![]() |
corner moldings used on the bottom corners of an opening |
![]() |
aluband used across the the whole bottom of an opening and up 200mm |
![]() |
aluband used at the top corners of an opening going out 200mm with butterfly 100mm x 50mm |
![]() |
ceiling battons on each side of opening from bottom of lintel to 100mm below floor |
![]() |
vernem strip along the house |
![]() |
vernem strip cut to allow for corners |
![]() |
packers and wedges used to help fit in windows |
![]() |
window temp fitted into opening |
![]() |
blocks set under window at 5 degrees and 50mm spacing |